A border that sits square
The dark border was set out so it frames the marble field evenly within the room.
Two pieces of natural stone work at The Goring Hotel: a marble floor with a dark stone border in one of the premium rooms, fitted in two days, and the sandstone stairs at the back entrance, with every piece cut in our workshop and fitted on site in four days.
Inside, we fitted a marble floor in a premium hotel room: a light marble field framed by a dark stone border, set out so the border sits square to the room. The floor was fitted in two days.
Outside, the back entrance needed new sandstone stairs. All the pieces were cut in our workshop, then brought to site and fitted, including the treads around the glass rooflight. The stairs took four days on site.
Working in a busy hotel means short time on site and pieces that fit first time.
The dark border was set out so it frames the marble field evenly within the room.
The marble floor was fitted in two days, keeping the room out of use for as little time as possible.
All the sandstone for the back-entrance stairs was cut in our workshop before it came to site.
The treads, risers and landing were fitted in four days on site.
Photographs taken on site at The Goring Hotel, SW1W.
The marble field and dark border, during fitting and on completion.
Sandstone cut in our workshop and fitted on site, from the first treads to the landing by the rooflight.
Tell us about the stone, the space and how long the area can be out of use. We will plan the cutting and fitting around it.