MASTER TILING LTD / NORTH WEST & CENTRAL LONDON
Master Tiling Ltd · Residential floor tiling

A traditional bathroom floor. Precisely renewed.

A complete floor replacement in Northwood, delivered while the homeowners were away. Beneath the old tiles, we uncovered a loose, poor-quality screed that needed replacing before we could lay the new black-and-white floor.

LocationNorthwood · HA6
Duration8 days
ScopeBathroom floor replacement
FinishChequered black & white Victorian mosaic with border
Explore the project ↘
Vanity and bath side of the bathroom – finished black-and-white geometric floorVanity and bath side of the bathroom – existing larger checkerboard tiles before replacementBEFOREAFTER

Original photographs of this Northwood bathroom, taken at different angles before and after the floor replacement. Use the slider to see the change.

01 / The brief

Eight days. Ready for the return home.

The homeowners arranged the work around their holiday. The goal was to have the existing floor replaced and the bathroom returned to full working order before they arrived back. That meant organising the removal, rebuilding the floor base and refitting the bathroom in a tightly planned programme.

The complication appeared only after the existing floor tiles were taken up. The screed beneath was loose and of poor quality. Covering it with a new finish would not have been appropriate, so the defective material had to be removed. This unexpected preparation was treated as an additional variation.

Work undertaken
  • Carefully removed the sanitaryware and existing floor tiles
  • Exposed, assessed and removed the loose screed
  • Laid a new screed approximately 30 mm thick
  • Installed the tile mat over the prepared floor
  • Fitted and grouted new black-and-white tiles with a decorative border
  • Reinstated the bathroom fittings for a fully usable room on the clients' return
03 / Behind the finish

Correct the substrate. Then lay the floor.

The hidden weakness beneath the old tiles shaped the programme and the installation approach.

01 / SURPRISE BELOW THE TILES

Loose screed uncovered

The existing screed could only be properly inspected once the tiles had been removed. It was loose and unsuitable as a reliable base for the new finish.

02 / ADDITIONAL PREPARATION

An unexpected variation

Removing the failed screed and forming a new approximately 30 mm screed was extra work not visible at the initial stage. This was recorded as a variation and required additional time.

03 / INSTALLATION

New base and tile mat

Once the replacement screed was prepared, a tile mat was installed before laying the black-and-white tiles and the patterned border. The floor was then grouted.

04 / CLIENT RETURN

A working bathroom in eight days

The fittings were put back in place and the room returned to use. The programme was arranged around the clients' holiday so they came home to a completed bathroom floor.

04 / The project in photographs

From the old floor to the finished detail.

Every image below comes from the photographs supplied for this Northwood project. No stock photos, simulated images or Dropbox-hosted images are used.

01 / Before

Original tiled floor

The larger black-and-white tiles before removal, with the existing bath, vanity and shower in place.

Original flooring from the shower side
Original floor and bathtub
Existing checkerboard tiles next to the vanity
Old tiles around the entrance
Original floor around the shower and WC
02 / Preparation

What was under the floor

After careful removal, the existing screed was found to be loose. Removing and replacing the failed substrate added unforeseen work to the programme.

Bathroom stripped for floor replacement
Existing services and skirting protected
Original tiles before screed removal
Substrate repairs after removing loose screed
Fresh replacement screed
New screed across the floor
Tile mat over prepared screed
03 / Completed

The finished patterned floor

A smaller black-and-white checkerboard with a geometric entrance border, grouted and ready for daily use.

Completed floor around the bath
Entrance border and continuous checkerboard
Bath, WC and shower side
Double vanity and detailed checkerboard tiles
Finished bathroom from the vanity side
Completed floor from the doorway
Finished floor beside the shower
Planning a replacement floor?

Start with a sound foundation.

Tell us about your existing floor, desired tile pattern and any concerns about what may be underneath.

Plan your tiling project ↗
Northwood bathroom floor project
Customer feedback on Google

Let our customers speak.

Customer feedback from Google Reviews. Tap any review to open the Master Tiling Ltd Google listing and read reviews there.

4.9/5
★★★★★41 Google reviews
All reviews on Google ↗
Have a project in mind?

Let's make it exceptional.

Share your plans and a few photos. We'll discuss the next steps.

Request a Similar Project Quote ↗
Call usFree site survey ↗