MASTER TILING LTD / NORTH WEST & CENTRAL LONDON
Master Tiling Ltd · Bathroom refurbishment

Two bathrooms, started by someone else. Finished properly by us.

A two-bedroom new-build flat in Mill Hill, NW7. The new owner chose to replace the developer's tiles with premium large-format 1200 × 600 mm porcelain in both bathrooms, his and hers. The first installer did not complete the job to an acceptable standard, so we took the project over part-way through: we stripped the work back, redid the preparation and waterproofing, retiled both rooms, rebuilt the lit niches and refitted the sanitaryware.

LocationMill Hill · NW7
Duration2 weeks
Rooms2 bathrooms · new-build flat
FinishLarge-format porcelain & illuminated niches
Explore the project ↘
The bath wall – finishedThe bath wall – during the workDURINGAFTER

The bath wall after we stripped out the previous tiling, and the finished bathroom with the whirlpool bath, screen and rain shower. Original site photographs from approximately comparable viewpoints. Use the slider to see the change.

01 / The brief

A failed job, taken over and done properly.

The client had just bought the flat and wanted both bathrooms retiled in premium large-format porcelain. The installer he first chose left the work in a poor state: open joints, rough cut-outs around the valves and the WC outlet, tape still stuck to the feature tiles and badly finished edges at the door frame.

We took the project over mid-way. Rather than tile over the problems, we removed the failed work, prepared and waterproofed the walls again, rebuilt the niches with lighting and retiled both bathrooms. We also refitted and reconnected the whirlpool bath, fitted the sanitaryware and, at the client's request, installed a toilet douche in both bathrooms. The whole project took two weeks.

Work undertaken
  • Removed the previous installer's tiling from both bathrooms
  • Prepared the walls again and waterproofed the wet areas
  • Rebuilt the niches, with lighting and brass-finish trims
  • Tiled both bathrooms in 1200 × 600 mm porcelain
  • Refitted and reconnected the whirlpool bath
  • Fitted the vanities, wall-hung WCs and shower screens
  • Installed a toilet douche in both bathrooms
02 / What went wrong

What we found. What we did about it.

Large-format tiles show every mistake, so the preparation has to be right before the first tile goes on.

01 / CUT-OUTS

Rough holes around fittings

We found oversized, ragged cut-outs around the valves and the WC outlet. Every opening was re-cut to fit the fittings neatly.

02 / JOINTS & EDGES

Open joints, unfinished edges

Joints were left open, tape was still on the feature tiles and the edges at the door frame were badly finished. We stripped it back and started again.

03 / WATERPROOFING

Prepared and waterproofed

The walls were prepared again and the wet areas and niches were waterproofed before any tiling.

04 / FINISH

Lit niches and a working bath

The niches were rebuilt with lighting and brass-finish trims, and the whirlpool bath was refitted and reconnected.

04 / The project in photographs

From a failed job to two finished bathrooms.

Photographs taken on site at Mill Hill, NW7: as we found it, during our work and on completion.

01 / As we found it

The previous installer’s work

How the bathrooms looked when we took the project over: rough cut-outs, open joints, tape left on the feature tiles and poorly finished edges.

Ragged cut-outs around the valves and pipework
Oversized holes left in the tiles on the WC wall
Open joints and tape left on the feature tiles
A rough cut-out around a valve
Badly finished tile edge at the door frame
02 / Stripped back

Removed, prepared and waterproofed

We removed the failed tiling, prepared the walls again and waterproofed the wet areas and the niches.

The bathroom stripped back, with the bath frame in place
The WC wall stripped back, with the niche opening
Waterproofing over the new boards and niche openings
Both niches waterproofed, with cables ready for the lighting
03 / Retiling

1200 × 600 mm porcelain

Both bathrooms retiled in large-format porcelain, with the niches framed in brass-finish trim.

Large-format porcelain going up around the whirlpool bath
The bath wall tiled with levelling clips
The shower room niche and WC wall during tiling
04 / Completed

The finished bathrooms

The finished bathrooms, with lit niches, wall-hung WCs and a toilet douche in each.

The finished bathroom: whirlpool bath, screen and vanity
Lit mirror niche and mosaic niche above the vanity
Wall-hung WC with the toilet douche
The tiled bath panel and floor
Towel radiator and the bath end
The mosaic niche, lit from above
The second bathroom seen from the bedroom
Walk-in shower, floating vanity and round lit mirror
The lit niche with glass shelf in the second bathroom
Bathroom work gone wrong?

We can take it over and put it right.

Send photos of the bathroom as it is now and tell us what was agreed. We will tell you honestly what needs to come out and what can stay.

Start an enquiry ↗
Mill Hill NW7 bathrooms
Customer feedback on Google

Let our customers speak.

Customer feedback from Google Reviews. Tap any review to open the Master Tiling Ltd Google listing and read reviews there.

4.9/5
★★★★★41 Google reviews
All reviews on Google ↗
Have a project in mind?

Let's make it exceptional.

Share your plans and a few photos. We'll discuss the next steps.

Request a Similar Project Quote ↗
Call usFree site survey ↗