600 × 300 mm ceramic
The principal wall finish was 600 × 300 mm ceramic tile, requiring a consistent setting-out strategy across different rooms and wall sections.
A six-week ceramic tiling package for the men’s and women’s personnel changing rooms and bathroom areas at The Dorchester Hotel, London W1K.
Finish: Ceramic tiles with recessed shadow-gap detail. Clean 600 × 300 mm tile layouts and considered junctions.

Master Tiling Ltd was proud to take on the tiling work in the personnel facilities at The Dorchester Hotel in Central London.
The scope covered approximately 235 m² of ceramic tiling to the men’s and women’s changing rooms and associated washroom and bathroom areas. The main tile format was 600 × 300 mm, with particular attention to the continuity of the tile layout and the lower wall termination.
Rather than finishing the tile directly against the floor, the wall detailing incorporated a shadow gap at the bottom — a subtle recessed separation that gives the ceramic finish a clean architectural edge.
The work was carried out over six weeks. The photographs below document original areas, preparation and the subsequent installation rather than presenting unfinished site photographs as final handover images.
See the installation record ↗
Scale, consistency and precise wall junctions mattered across changing rooms, washrooms and connected circulation areas.
The principal wall finish was 600 × 300 mm ceramic tile, requiring a consistent setting-out strategy across different rooms and wall sections.
The tiled walls were detailed with a bottom shadow gap to create a deliberate visual break between the wall finish and floor.
The tiling package covered the men’s and women’s changing-room and bathroom areas, including entrances, recesses and adjoining spaces.
Our team undertook the project over six weeks, working through the different areas and installation stages shown in the original site photographs.
Original photographs from our Dorchester project archive, grouped by stage. Select a photograph to enlarge it. Construction-stage images are labelled accordingly.
Project photographs are shown in chronological stages where identifiable. The images record existing rooms, construction and tiling installation rather than implying every photograph is a completed space.
The green feature walls before the fittings went in, and the same areas once the lit mirrors and fitted units were installed. Original site photographs from approximately comparable viewpoints.

BEFOREAFTERThe tiled feature wall above the washroom counter before fit-out, and the same wall with the illuminated mirrors in place.

BEFOREAFTERThe niche during tiling, and the finished unit with lit shelving and fitted cabinets.


The core ceramic tiling was complemented by a darker, glazed feature-tile treatment visible in the washroom photographs. Repeated wall sections, door returns and changes of level required careful alignment.
These images show the installation at different stages. They also illustrate the attention involved in working across a substantial commercial area while keeping the individual details consistent.
Browse more Master Tiling projects ↗Commercial bathrooms, changing rooms, wall tiling and complex refurbishment programmes across London.
Share your plans and a few photos. We'll discuss the next steps.